This project consisted of two different elements, both requiring all works to be constructed off-site in our work shop then craned into position onsite.
The first stage consisted of balustrades being prefabricated in our factory with Rheinzink Standing Seam to the front and 9mm cement sheet to the back.
Stage two saw the construction of 4-storey high curtain walling, which was also built and clad with Rheinznik and incorporated windows through-out.
The project looked fantastic and our clients were once again impressed.
Installation of Graphite Grey Rheinzink in Standing Seam to balustrades and Graphite Grey Rheinzink Express Panel to 4 curtain walls on North & South Elevations.